wiki:WikiStart
Last modified 4 years ago Last modified on 12/16/14 10:18:47

WORK Future Tasks MEETINGS Relations


Open Flow Secure Grid OFSE

Short introduction to OFSE

Project specifications/boundaries

  1. OF control risks (communication between of switch and of controller) will be looked at theoretically only
  1. Will not have SCADA in test bed
  1. OF time synchronization will be based on ntp/gps clocks

WORK

WP1 Management

MEETINGS

WP2 OF Technical Risk Assessment

WP3 OF Rapid Prototype

WP4 OF Modelling

Future Tasks

  1. Mapping of goose, sv, ... traffic using OpenFlow

Potentially of interest for testing:

"It should be kept in mind that the reliability of of GOOSE messages depends on the prerequisite that not more than two consecutive messages are lost. This prerequisite has been validated by a lot of tests based on physical disturbance scenarios [3], pages 53-56."

"...the latencies of the critical protection GOOSE frames [must] be less than 10 ms 99,99 % of the time [8], page 109."

MEETINGS

  • 2013-10-03 OFSE !Testbed First testbed ideas_
  • 2013-10-11 OFSE Find boundaries in OFSE Start Result
  • 2013-10-18 OFSE OFSE Testbed Status, further steps
  • 2013-10-25 OFSE Update meeting (Testbed, Controller, Template WP2, info about TeraStream)
  • 2013-11-08 OFSE OpenFlow Version 1.0 versus 1.4 Aufstellung

RELATIONS to other topics


REFERENCES

[1] Stefan Fellner, Lisa Siegesleitner, Dominik Stradner, Echtzeit für IEC 61850, Research & Development Project

[2] Slides Thomas showed about OFSE testbed

[3] Klaus-Peter Brand, Wolfgang Wimmer, Reliable Networking, ABB Review Special Report on IEC 61850

[4] Kim, Metzner, A Hierarchical Communication Network Architecture for Smart Grid, IEEE SmartGridComm

[5] Aggarwal et al., A Proposed Communications Infrastructure for the Smart Grid, Innovative Smart Grid Technologies, Presentation

[6] Patel et al., Assessing Communications Technology Options for Smart Grid Applications, IEEE SmartGridComm

[7] IEC 61850-5, Communication requirements for functions and device models, Edition 1.0

[8] IEC/TR 61850-90-4, Network Engineering Guidelines, Edition 1.0

[9] Maciej, Goraj, IEC 61850 Network Architectures, Presentation

[10] ArbeitsKreis? 952.0.1, Applikationen mit Diensten der IEC61850 Version 1.0


http://trac.edgewall.org/demo-1.0/wiki/WikiFormatting